Download section

 
 
     BEXLEYHEATH SCHOOL
  A new multi storey building including a science block, music & drama facility and library together with the renewal of the existing 2 mega watt central boiler house. This project required PMA to integrate the external underground services from the central boiler house facility to each of the new buildings. Project Value £3M  

     CLAPTON GIRLS TECHNOLOGY COLLEGE Full Case Study
  Clapton Girls Technology College is a part of the Hackney role out of Building Schools for the Future. Project Value £10.0M